Construction waste crusher eliminate worries for you

Construction waste is redundant construction waste material production directly or by the construction industry, includes building materials, such as insulation, nails, wire, bars, and waste materials, such as dredge from plough stumps and may contain lead the rubble, building waste, asbestos, or other harmful substances.The construction waste crusher may be the separation and recycling of recoverable waste materials generated during construction and remodeling. Packaging, new material scraps and old materials and debris all constitute potentially recoverable materials. In renovation, appliances, masonry materials, windows and doors are recyclable.

Urban Construction Waste Management Regulations of the ministry of construction was performed last June 1st. It requires that every company or individual mustn’t dump, throw or pile construction waste reclycling process flow. The waste earth and materials produced by the construction, installation, removal, or repair of the construction company or individual will pollute the environment severely, and affect the city life. Residents should collect the construction waste and life garbage generated by decorating house respectively, pile them to the designated locations, and the set of construction waste transfer station should provide convenience for residents. The company or individual who doesn’t deal with the construction waste according to the regulations should be punished heavily, so that the urban construction waste management can be reinforced, and the city environmental sanitation can be ensured.

The flow of stone crushing plant

First, raw materials are sent to the vibrating feeder through hopper, they are fed into rock jaw crusher evenly and continuously. After crushed by jaw crusher plant, materials are then sent into rock impact crusher where it will be through secondary crush which makes cubical shaped product. After second crushing, materials are sent to vibrating screen which will separate different products according to your requirements. While those particles haven’t attained the required fineness will be returned to impact crusher for tertiary crushing. According to different techniques requirements, deploy with suitable model equipment, and develop its optimum behavior.

This entry was posted in Stone Crushing Plant. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *